Renovation of the Forensic Laboratory and Administration areas at the Sudbury State Police Crime Lab Facility included:  HVAC, plumbing, electrical, lighting and associated controls; new fire alarm devices; and sprinkler system.  During the winter of 2015 structural engineering consulting services were provided related to the evaluation of the snow loading and roof framing.

Sudbury, MA

23,340 sq. ft.

Related Projects