top of page
Just H&A_transparent.png

H&A was contracted by the City of Westfield to determine the culpability of a faulty cast concrete balustrades system in Half Mile Falls Park.


Following the study and fail testing, H&A was contracted to remove the concrete system and replace it with a metal railing system at Half Miles Falls Park and two other parks in Westfield: Kane/Wojtkiewicz Park and Women’s Temperance Park.


Our success on this project contributed to our selection as the City of Westfield's On-Call Architect.

Location

Westfield, MA

Revitalization

  • Forensic investigation of concrete failure


  • Removal and replacement of precast concrete balustrade assembly at 3 parks

Half Mile Falls Park

VISIT US 
TODAY

  • Grey Instagram Icon
  • Grey Facebook Icon
  • Grey LinkedIn Icon

H&A Boston
    
150 Longwater Drive, Suite 201
Norwell, MA 02061

H&A Worcester 
 
43 Harvard Street, Upper Level
Worcester, MA 01609

H&A Rapid City 
  
5201 Waxwing Lane
Rapid City, SD 57702

Phone: (781) 871-9804
Email: Architects@habeebarch.com

© 2025 Habeeb & Associates, Inc. All rights reserved.
bottom of page